Luxury family apartments in Mielno by the sea

GREEN MARINA

Your Place By The Sea. Memories That Will Last Forever.

Discover luxurious family apartments 500m from the beach, with a private spa and surrounded by forest. No reservations required. Own your own.

Price
Just 6-minute walk to the beach
Forest
Neighborhood forest and Natura 2000
Availability
On offer 21 of 24 apartments
Discover Your Place

Turn annual stress into spontaneous joy.

Packing. Reservations. Crowds. You know this all too well.

Every family trip is a logistical undertaking. Hours of packing, frantic searches for available dates, and compromises in crowded guesthouses. Does vacation have to be like this?

Green Marina: Your base. Always ready.

Imagine a weekend without any planning. You just get in the car and drive to your place, where everything is waiting. Towels, a bike, beach toys. That's true freedom.

Why Zielona Marina is the perfect place for your family

Full-year profit

Memories all year round

The private SPA area with jacuzzi is the perfect place to relax after an autumn walk, and the proximity of the forest encourages you to discover nature at any time of year.

Comfort

The comfort you are looking for

Underfloor heating, a smart home system and a turnkey finish mean that from day one you can simply enjoy your holiday, without any renovations or stress.

Nature

Nature and adventure at your fingertips

The proximity of Natura 2000, the Forest Adventure Loop and the R10 cycling route provide endless opportunities for active outdoor activities.

Privacy

A private oasis away from the crowds

Our intimate location guarantees peace and quiet, while also allowing for a quick walk to the center of Mielno when you feel like a bit of a resort.

Plan your space for happiness.

Parking spaces: External: PLN 30,000 net • Garage: from PLN 80,000 net

Apartment number Floor Area (m²) Reservation PDF card Net price
M1 First 43,26 Available PDF 562,380 PLN
M2 First 43,26 Available PDF 562,380 PLN
M3 First 45,44 Available PDF 586,176 PLN
M4 First 50,7 Available PDF 654,030 PLN
M5 First 41,26 Available PDF 536,380 PLN
M6 First 41,26 Available PDF 536,380 PLN
M7 First 50,7 Reserved PDF Inaccessible
M8 First 45,44 Available PDF 599,808 PLN

Quality that pays off

  • Detailed description of the developer's condition with high-quality materials
  • Private SPA area with sauna, jacuzzi and fitness area
  • Sun terrace with a view of the forest and surrounding area
  • Secure garage (from PLN 80,000 net) and outdoor spaces (PLN 30,000 net)
  • Smart home system with remote control
  • Underfloor heating throughout the apartment
  • Photovoltaic panels and heat pump
  • Storage units for extra space

Zielona Marina Investment Schedule

Below, we present the planned work schedule for the Zielona Marina investment. We've broken it down into key stages to give you a better idea of what will be happening on the construction site and when.

Stage 1: Earthworks (May – June 2025)

We begin by preparing the construction site. During this stage, the following work will be performed:

  • Purchase of land and preparation of the architectural and construction design
  • Preparation of the construction site
  • Earthworks

Stage 2: Baseline (July 2025)

This month, we'll focus on the building's foundations. The scope of work includes:

  • Continuation of earthworks
  • Construction of external networks
  • Execution of reinforced concrete works for foundations

Stage 3: Open shell (August 2025)

We are beginning construction of the building's structure. Work in this phase includes:

  • Reinforced concrete and masonry works on the ground floor
  • Reinforced concrete and masonry works on the first floor

Stage 4: Open shell stage - continuation (September - October 2025)

We are continuing work on the building's structure, up to the third floor. During this period, we will complete:

  • Brick walls and reinforced concrete works on floors I, II and III
  • Installation of external window and door joinery

Stage 5: Shell stage closed (November 2025 – March 2026)

This stage is one of the most important stages of construction, when the building will be closed and installation and finishing work will begin. The scope of work includes:

  • Completion of brick walls and reinforced concrete works on all floors
  • Installation of water, sewage, gas, ventilation, central heating, electrical and telecommunications systems
  • Construction of internal partition walls
  • Insulation and roof covering
  • Interior plasters and cement floors
  • Facade works

Stage 6: Developer status (April – July 2026)

We are focusing on further finishing and installation work. At this stage, we plan to:

  • Completion of roofing work
  • Installation of installations, including boiler rooms
  • Execution of external plastering, installation of an elevator, balustrades and construction of internal roads and sidewalks

Stage 7: Developer status – final works (August – October 2026)

We are finalizing development work, preparing the investment for handover. Scope of work:

  • Completion of installation work
  • Garage door installation
  • Development of green areas and plantings
  • Finishing of common areas
  • Making connections to external networks

Acceptances (November 2026 – January 2027)

After all construction works are completed, the technical acceptance stage will take place.

Transfer of ownership (February – March 2027)

The final stage will be the conclusion of agreements transferring ownership of the apartments to the buyers.

Attention: The presented schedule is indicative and individual dates may change slightly.

Download detailed schedule PDF

We build with generations in mind.

Meet the developer who understands the needs of families

About the Developer

Bobruk Investments Sp. j. is a family-owned development company with many years of experience. We create places we would love to live and relax in. See our completed investments.

15+

Years of experience

500+

Apartments delivered

100%

Timely execution

Our latest projects

Green Rembertów
Green Rembertów

32 apartments in Warsaw

Completed 2023
Secluded Residence
Secluded Residence

40 apartments in Ustronie Morskie

Completed 2022
Family Park Settlement
Family Park Settlement

Premium cottages in Mielno

Completed 2021

See the real progress of construction works

Current photos and videos from construction - October 2025

Aerial view of the investment - October 2025

Current photos from the construction site

Work progress - first floor and balcony formwork
View of the first floor and the balcony formwork
Aerial view of the construction site
Aerial view of the entire investment
Bird's eye view
Perspective showing the investment environment

Detailed overview of the first floor and balconies

The investor is giving a tour of the construction site, showing the first floor and the poured balconies with live commentary.

Start making memories today.

Complete the form and our Sales Director will contact you to arrange a no-obligation meeting and apartment viewing.

Renata Bobruk

Renata Bobruk

Sales Director

    Send a message





    The controller of your personal data is Inwestycje Bobruk Sp. j., based in Wrocław. We process your data for marketing purposes based on your voluntary consent (Article 6, paragraph 1, letter a of the GDPR). You have the right to withdraw your consent at any time, as well as the right to access, rectify, and delete your data, and other rights described in our Privacy Policy.